6A schedule of rates is:AA list of standard rates for items of work in an areaBA time scheduleCA drawingDA list of materials onlyView AnswerDiscussWorkspaceReportSaveEasy
7A detailed estimate is prepared:ABefore any designBFrom cube rate onlyCFrom plinth area onlyDFrom detailed drawings, item by itemView AnswerDiscussWorkspaceReportSaveEasy
8Plastering is usually measured in:ARunning metresBKilogramsCCubic metresDSquare metresView AnswerDiscussWorkspaceReportSaveEasy
9Earthwork is usually measured in:ACubic metresBRunning metresCSquare metresDNumbersView AnswerDiscussWorkspaceReportSaveEasy
10Contingencies in an estimate are typically:A25%B0%C50%D3–5% of the estimated costView AnswerDiscussWorkspaceReportSaveEasy