1The centre-line method is used to calculate:APainting areasBQuantities of walls and foundationsCConcrete strengthDSteel weightsView AnswerDiscussWorkspaceReportSaveEasy
2Rate analysis determines:AThe design loadBThe total project durationCThe soil typeDThe cost per unit of an item of workView AnswerDiscussWorkspaceReportSaveEasy
3Earthwork is usually measured in:ARunning metresBCubic metresCSquare metresDNumbersView AnswerDiscussWorkspaceReportSaveEasy
4An abstract estimate gives:AOnly specificationsBOnly drawingsCQuantities multiplied by rates to get the total cost of each itemDOnly labourView AnswerDiscussWorkspaceReportSaveEasy
5A tender is:AAn offer by a contractor to carry out work at stated ratesBA government orderCA measurement bookDA type of foundationView AnswerDiscussWorkspaceReportSaveEasy